Project Construction and Operation Cost
Date:Mar,14,2013     Views:2693

PROJECT CONSTRCTION AND OPERATION COST

 

(2012)


ACost of Buying the Land Use Right

1land price: according to the auction result

2land use fee: 2-6 RMB/m2/year

BRelevant Fee During the Land Purchase & Factory Construction

Relevant fee during the construction process

1Wall promotion fee: can be refunded if new material bricks used

2Anti-ants fee: 1.5 RMB/m2

3Special cement fund: 3 RMB/ unit

4Project example fee:2596 RMB/ unit

5Survey and draw fee: 952 RMB/ unit

6Lightening protection design fee: 0.8 RMB/ m2

    7Lightening protection design fee: 0.8 RMB/ m2

8Equipotential testing fee: 100 RMB/point,

   According to the factory layout

After construction fee

1house property registration fee:

   200 RMB/tower for 500m2 below;

   300 RMB/tower for 500-1000 m2

       800 RMB/tower for 2000-5000 m2

       1000 RMB/tower at most

    2building survey & draw fee: 1.2 RMB/ m2

3Land property examine fee:

   100RMB/tower 1000 m2 below;

   40 RMB need for every extra 500 m2;

   40,000RMB/tower at most

4contract fee for land purchase: 3% of the total land purchase cost

CBusiness operation fee

1Water price:4.4 RMB(including sewage charge)

2Elctricity price: 0.7 RMB (average Electricity price)

3heat supply:

CATEGORY

HEAT GAS SUPPLY AMOUNT

(tons/month)

PRICE

(RMB/tons)

1

20001 and above

188.5

2

1000120000

191.5

3

500110000

194.5

4

30015000

197.5

5

20013000

200.5

6

10012000

203.5

7

3011000

206.5

4human resource price:

white collar: 3000 RMB/month

blue collar: 2500 RMB/month

social welfare fee:

1533 RMB (2011 average salary of Haiyan) ×24.4%×staff member

 